{"id":27700,"date":"2024-09-23T15:52:10","date_gmt":"2024-09-23T13:52:10","guid":{"rendered":"https:\/\/clockify.me\/blog\/?p=27700"},"modified":"2026-03-09T18:44:00","modified_gmt":"2026-03-09T16:44:00","slug":"fast-tracking-in-project-management","status":"publish","type":"post","link":"https:\/\/clockify.me\/blog\/managing-tasks\/fast-tracking-in-project-management\/","title":{"rendered":"Get Back on Track with Fast Tracking in Project Management"},"content":{"rendered":"\n<p>You\u2019ve planned ahead, made sure all the required resources were available, assigned tasks to a capable team timely \u2014 and yet, the project is falling behind schedule.<\/p>\n\n\n\n<p>You can prevent the worst-case scenario (i.e. the project missing a fixed deadline) with <strong>fast tracking<\/strong>.<\/p>\n\n\n\n<p>Fast tracking in project management requires team members to work on some tasks at the same time. This ups the risks significantly \u2014 but in some instances, it\u2019s the best way to bring a project back on track.<\/p>\n\n\n\n<p>In this article, we\u2019ll explain how to meet the deadline with project fast tracking, and when it\u2019s appropriate to use this method.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover.jpg\" alt=\"Get Back on Track with Fast Tracking in Project Management - cover\" class=\"wp-image-27695\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover.jpg 1200w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover-600x300.jpg 600w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover-1110x555.jpg 1110w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover-768x384.jpg 768w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Get-Back-on-Track-with-Fast-Tracking-in-Project-Management-cover-18x9.jpg 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 id=\"1-ensure-fast-tracking-is-the-most-logical-option\" class=\"wp-block-heading\">#1: Ensure fast tracking is the most logical option<\/h2>\n\n\n\n<p>Fast tracking in project management is a <strong>schedule compression technique<\/strong> that involves completing tasks in parallel rather than in sequential order. This allows you and your team to save a project that is falling behind schedule.<\/p>\n\n\n\n<p>Before you set everything in motion and start <strong>fast tracking<\/strong> \u2014 consider all your options for meeting the deadline.<\/p>\n\n\n\n<p>For example, another schedule compression technique is <strong>project crashing<\/strong>. This project management method requires additional resources to shorten the project turnaround time.<\/p>\n\n\n\n<p>As opposed to project crashing, fast tracking a project doesn\u2019t incur additional costs. This makes fast tracking a better option for projects with tight budgets. However, considering that your team would handle multiple tasks at the same time \u2014 it also leaves more room for error.<\/p>\n\n\n\n<p>In cases where the benefits of fast tracking outweigh the risks, this technique can bring high rewards.<\/p>\n\n\n\n<p>Owner of a custom metal fabrication company, <a href=\"https:\/\/www.linkedin.com\/in\/jasonwu316\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jason Woo<\/a>, is no stranger to fast tracking due to delays in material delivery:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner.jpg\" alt=\"Jason Woo, company owner\" class=\"wp-image-27696\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner.jpg 600w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner-300x300.jpg 300w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner-12x12.jpg 12w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cDelays in getting the necessary material meant our production schedule was off. Fast tracking became essential not just to meet our delivery deadlines, but also to make a positive first impression on our new partners. Moreover, our experience in handling project processes simultaneously helped us deliver the expected quality.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>He also recalls a situation where his company launched a new surface treatment line. They resorted to fast tracking to avoid being impacted by the quickly changing market:<\/p>\n\n\n\n<div class=\"wp-block-columns pro-blockquote is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner.jpg\" alt=\"Jason Woo, company owner\" class=\"wp-image-27696\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner.jpg 600w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner-300x300.jpg 300w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Jason-Woo-company-owner-12x12.jpg 12w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><em>\u201cAnother scenario involved launching a new surface treatment line. The market situation was changing rapidly due to new technology changes, and delaying the launch would mean losing significant market share. Leveraging our reliable team and beating the industry&#8217;s pace through fast tracking became the logical choice.\u201d<\/em><\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Despite its risks, fast tracking can help bring your project to a close on time \u2014 just make sure it\u2019s the most viable solution for that particular project.<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 CLOCKIFY PRO TIP<\/strong><\/p>\n\n\n\n<p>Here are some project management best practices to consider before you make your final decision on whether to fast-track your project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/clockify.me\/blog\/productivity\/project-management-best-practices\/\" target=\"_blank\" rel=\"noreferrer noopener\">11 Project Management Best Practices You Must Know<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"2-identify-the-tasks-that-can-be-completed-in-parallel\" class=\"wp-block-heading\">#2: Identify the tasks that can be completed in parallel<\/h2>\n\n\n\n<p>The main goal of fast tracking is to complete the project faster without changing the project scope.&nbsp;<\/p>\n\n\n\n<p>To shorten the project duration, some tasks need to be completed in parallel. However, bear in mind that you can only fast-track tasks that are on the <strong>critical path<\/strong> \u2014 the longest sequence of dependent tasks.&nbsp;<\/p>\n\n\n\n<p>This means that these tasks directly impact the time it would take to complete the project. If one task is delayed, it would delay the whole project.<\/p>\n\n\n\n<p>Therefore, implementing the fast tracking technique requires you to find tasks on the critical path and determine which ones can be worked on simultaneously.<\/p>\n\n\n\n<p>Remember that these tasks mustn\u2019t completely depend on each other. For illustration, if task B is completely dependent on task A, it means that your team can\u2019t start working on B until task A is finished.<\/p>\n\n\n\n<p>This stage of fast tracking requires you to carefully analyze task dependencies and modify the schedule while maintaining realistic goals.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Use <a href=\"https:\/\/clockify.me\/\" target=\"_blank\" rel=\"noreferrer noopener\">Clockify<\/a> by <a href=\"https:\/\/cake.com\/\" type=\"link\" id=\"https:\/\/cake.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">CAKE.com<\/a> to visualize the project timeline and easily determine the tasks suitable for fast tracking.<\/p>\n\n\n\n\n<div class=\"banner banner-dark clockify-gradient-features\">\n    <div class=\"banner-text lg:pr-[6rem]\">\n        <span class=\"h4 text-lg translation-block mb-0\">Free time tracker<\/span>\n        <p class=\"translation-block mt-1 mb-3\">Time tracking software used by millions. Clockify by CAKE.com is a time tracker and timesheet app that lets you track work hours across projects.<\/p>\n\n        <div class=\"banner-buttons d-flex gap-4 align-items-center translation-block justify-content-center justify-content-sm-start\">\n            <a class=\"bg-white rounded px-3 py-1 text-gray-dark\" href=\"https:\/\/app.clockify.me\/en\/signup\" target=\"_blank\">Sign up<\/a>\n\n                            <a class=\"button-2\" href=\"https:\/\/clockify.me\/apps\" target=\"_blank\">Learn more<\/a>\n                    <\/div>\n    <\/div>\n\n    <div class=\"banner-image banner-image-middle \">\n        <picture>\n            <source srcset=\"https:\/\/clockify.me\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/clockify\/features@2x.png 2x\" alt=\"Illustration\"  media=\"(min-width: 1022px)\" \/>\n            <img decoding=\"async\" src=\"https:\/\/clockify.me\/blog\/wp-content\/themes\/cake-blog\/theme\/images\/banners\/clockify\/features.png\"  alt=\"Illustration\" \/>\n        <\/picture>\n    <\/div>\n<\/div>\n    \n\n\n\n<p>When you assign tasks to team members in Clockify, you can see the project and team schedule. The project schedule window shows you the projects and milestones.<\/p>\n\n\n\n<p>Being able to see the whole timeline for your project allows you to reorganize the schedule in a way that ensures the milestones aren\u2019t jeopardized.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"747\" height=\"600\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Project-schedule.jpg\" alt=\"Project schedule\" class=\"wp-image-27697\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Project-schedule.jpg 747w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Project-schedule-374x300.jpg 374w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Project-schedule-15x12.jpg 15w\" sizes=\"auto, (max-width: 747px) 100vw, 747px\" \/><figcaption class=\"wp-element-caption\">Project schedule in Clockify<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Having chosen the tasks to be completed at the same time, you can move on to the next stage \u2014 selecting team members to work on these tasks.<\/p>\n\n\n\n<h2 id=\"3-choose-the-team-members-available-to-complete-the-tasks\" class=\"wp-block-heading\">#3: Choose the team members available to complete the tasks<\/h2>\n\n\n\n<p>Research has shown that miscommunication is <a href=\"https:\/\/www.researchgate.net\/publication\/367542760_Project_Failure_A_Bad_Communication_Case_Study\" target=\"_blank\" rel=\"noreferrer noopener\">one of the leading causes of project failure<\/a>.<\/p>\n\n\n\n<p>But fast tracking requires your team to start working on multiple tasks at the same time \u2014 which calls for more frequent communication.<\/p>\n\n\n\n<p>To avoid misunderstandings, be tactical when <strong>choosing team members<\/strong> to work on the project. You can pair those who have shown in the past to effectively work together.<\/p>\n\n\n\n<p>Also, pay attention to <strong>who is available<\/strong> for the period you want to schedule the tasks. If you\u2019re in a hurry to assign tasks and start the project, you may overlook your team\u2019s schedule.<\/p>\n\n\n\n<p>Clockify visualizes team capacity, making it clear:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Who<\/em> is available,&nbsp;<\/li>\n\n\n\n<li><em>When<\/em>, and&nbsp;<\/li>\n\n\n\n<li><em>How long<\/em>.<\/li>\n<\/ul>\n\n\n\n<p>When you <a href=\"https:\/\/clockify.me\/blog\/managing-teams\/give-assignments\/\" target=\"_blank\" rel=\"noreferrer noopener\">create assignments for your team<\/a> in Clockify, you can <strong>view team capacity<\/strong>.<\/p>\n\n\n\n<p>Since Clockify gives you all this information at a glance, you won\u2019t have to worry about overbooking any staff members.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"852\" height=\"600\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Team-schedule.jpg\" alt=\"Team schedule\" class=\"wp-image-27698\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Team-schedule.jpg 852w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Team-schedule-426x300.jpg 426w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Team-schedule-768x541.jpg 768w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Team-schedule-18x12.jpg 18w\" sizes=\"auto, (max-width: 852px) 100vw, 852px\" \/><figcaption class=\"wp-element-caption\">Team schedule in Clockify<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.clockify.me\/en\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Create team schedule in Clockify<\/a><\/p>\n\n\n\n<p>Once you\u2019ve seen who\u2019s available and assigned tasks to team members who are most likely to excel in this situation \u2014 the work on the project can begin.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group pro-tip\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>\ud83d\udca1 CLOCKIFY PRO TIP<\/strong><\/p>\n\n\n\n<p>For information on the importance of time tracking in project management, look no further than this article:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/clockify.me\/blog\/tracking-time\/time-tracking-in-project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Why time tracking is essential for project management<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<h2 id=\"bonus-keep-a-close-eye-on-project-progress-with-clockify-by-cake-com\" class=\"wp-block-heading\">Bonus: Keep a close eye on project progress with Clockify by CAKE.com<\/h2>\n\n\n\n<p>Successfully implementing schedule compression techniques \u2014 like fast tracking \u2014 requires a solid plan but also being aware of the <strong>status of the project<\/strong> at all times. This ensures your project stays on the right track and allows you to make modifications along the way.<\/p>\n\n\n\n<p>To stay on top of your project and track its progress in real time, use Clockify.<\/p>\n\n\n\n<p>In Clockify, you can see <strong>how much time your team has tracked<\/strong> on a particular task to make sure that the project is heading in the right direction.<\/p>\n\n\n\n<p>You can also add time estimates to see how the time tracked on the particular project compares to the time it should take for the project to be completed on time.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"388\" height=\"262\" src=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Time-estimate.jpg\" alt=\"Time estimate\" class=\"wp-image-27699\" srcset=\"https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Time-estimate.jpg 388w, https:\/\/clockify.me\/blog\/wp-content\/uploads\/2024\/09\/Time-estimate-18x12.jpg 18w\" sizes=\"auto, (max-width: 388px) 100vw, 388px\" \/><figcaption class=\"wp-element-caption\">Time estimate in Clockify<\/figcaption><\/figure>\n<\/div>\n\n\n<p>If you <strong>set up alerts<\/strong>, you\u2019ll get a notification whenever someone tracks more or less time than estimated. This enables you to easily observe any unanticipated timeline changes and adapt accordingly.<\/p>\n\n\n\n<p>Ultimately, you can effectively prevent project failure with fast tracking. The key is to correctly determine what tasks are eligible for this form of schedule compression and assemble the right team.&nbsp;<\/p>\n\n\n\n<p class=\"custom-btn\"><a href=\"https:\/\/app.clockify.me\/en\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">Monitor projects with Clockify<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fast tracking in project management refers to a technique that helps finish projects that can\u2019t be delayed.<\/p>\n","protected":false},"author":50,"featured_media":27704,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-27700","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-managing-tasks"],"acf":[],"_links":{"self":[{"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/posts\/27700","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/comments?post=27700"}],"version-history":[{"count":13,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/posts\/27700\/revisions"}],"predecessor-version":[{"id":36839,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/posts\/27700\/revisions\/36839"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/media\/27704"}],"wp:attachment":[{"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/media?parent=27700"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/categories?post=27700"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/clockify.me\/blog\/wp-json\/wp\/v2\/tags?post=27700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}